Post reply

The message has the following error or errors that must be corrected before continuing:
Warning: this topic has not been posted in for at least 120 days.
Unless you're sure you want to reply, please consider starting a new topic.

Note: this post will not display until it's been approved by a moderator.

Name:
Email:
Subject:
Message icon:
Verification:
Please leave this box empty:

Type the letters shown in the picture
Listen to the letters / Request another image

Type the letters shown in the picture:

shortcuts: alt+s submit/post or alt+p preview

Topic Summary

Posted by sukishan
 - Aug 13, 2009, 07:20 PM
Performing Spares Optimization
The AvSim module may be used to simulate the effects of different spares holding levels on lifetime costs. The user sets site and depot minimum and maximum values for all selected spares. When performing a spares optimization run AvSim will try spares holding values within the specified range only.

The program performs simulation runs for each combination of spare part holdings (between range values) for each selected spare part. Once all the simulation runs have been completed AvSim will display the optimum spare holdings from a cost viewpoint at site and depot.
IT Acumens Web Designing Chennai | GinGly :: Build your Personal Website | CineBuzz :: Cinema News | My Kids Diary :: Gift your Kids Memories :: Book Website @ 349 Rs monthly
Copyright 2005 - 2021 :: IT Acumens :: All Rights Reserved. :: XML Sitemap
ITAcumens Discussion Forum with 2 lakhs post running for 15 years - Powered by IT Acumens Pro Dedicated Server

My Kids Diary